The metallic and non-metallic jacketing installation at ADNOC site was flawless. Protek’s project team maintained safety compliance and zero punch items.
Mohammed Al Hammadi, EPC Contract Manager, ADNOC Site
On our HVAC ducts project in Umm Al Quwain, Protek delivered clean, thermal-wrapped ducting with minimal disruption to operations.
Ahmed Al Nuaimi, Facility Manager, Umm Al Quwain HVAC Project
Protek provided passive fire protection on our cable trays in record time. Coating adhesion and fire rating met international standards.
Leena Purohit, Fire Safety Officer, Chemical Processing Plant
Their cryogenic insulation team installed vapor-barrier PIR panels for our LNG storage lines with zero moisture ingress reported.
Rashid Mohammed, Cryogenic Engineer, LNG Terminal
Protek’s removable valve and flange jackets saved us critical downtime during planned maintenance. Fantastic workmanship and documentation.
Protek supplied and installed acoustic insulation for our power plant compressors. Noise reductions were as specified and crew operations unaffected.
Khalid Al Suwaidi, HSE Manager, Fujairah Power Plant
At a Gulf chemical terminal, Protek executed rockwool and cladding works on tight deadlines. The project finished ahead of schedule.
Noura Al Owais, Engineering Superintendent, Gulf Chemical Facility
Our desalination project for Dubai Municipality involved large-scale insulation. Protek managed logistics impeccably and delivered high-quality installations.
Hassan Al Ameri, Projects Coordinator, Dubai Municipality
Protek delivered insulation for Emirates Steel pipeline and equipment in challenging timelines. The execution met all QA checkpoints.
Sergei Vasilev, Site Operations Manager, Emirates Steel Industries
IL&FS Prime Technology’s plant saw flawless insulation of over 120,000 ft². Protek’s technical strength and QA protocols were top-tier.
Anita Singh, Plant Engineering Manager, IL&FS Prime Technology
We relied on Protek to insulate ENOC pipelines across multiple refinery zones. Their team was highly responsive and safety-conscious.
Saeed bin Yousef, Maintenance Lead, ENOC Refinery
Protek executed pipeline insulation and cladding for Dubai Supply Authority with precision. Their delivery was on time and fully compliant.
Fatima Al Falasi, Main Contractor Liaison, Dubai Supply Authority
At JK Cements, Protek handled 235,000 ft² of thermal insulation across kilns and ducts. Their professionalism and quality were exceptional.
Rakesh Patel, Operations Director, JK Cements
Working with Protek on Emirates Aluminium’s factory expansion (100,000 ft²) was seamless. Their engineering accuracy and coordination were outstanding.
Aisha Hassan, Project Manager, Emirates Aluminium
The metallic and non-metallic jacketing installation at ADNOC site was flawless. Protek’s project team maintained safety compliance and zero punch items.
— Mohammed Al Hammadi, EPC Contract Manager, ADNOC Site